{"id":6971,"date":"2026-08-25T07:12:49","date_gmt":"2026-08-25T07:12:49","guid":{"rendered":"https:\/\/www.paytmmoney.com\/blog\/?p=6971"},"modified":"2026-08-25T07:16:59","modified_gmt":"2026-08-25T07:16:59","slug":"annu-projects-ipo-review","status":"publish","type":"post","link":"https:\/\/www.paytmmoney.com\/blog\/annu-projects-ipo-review\/","title":{"rendered":"Annu Projects IPO Review: Key Details,Company Overview &#038; Financials"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">Annu Projects IPO is a book-built issue of \u20b9175.06 crores, comprising an entirely fresh issue of 1.77 crore shares. The IPO will open for subscription on Aug 25, 2026, and close on Aug 28, 2026. The allotment is expected to be finalized on Aug 31, 2026, with the shares scheduled to list on both NSE and BSE on Sep 2, 2026.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The price band is fixed at \u20b994 to \u20b999 per share, with a lot size of 151 shares. Retail investors need to invest a minimum of \u20b914,949 for one lot at the upper price band. Mefcom Capital Markets Ltd. is the book-running lead manager, while Kfin Technologies Ltd. is the registrar to the issue.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">For detailed information on the company&#8217;s business, financials, risk factors, and the proposed utilisation of proceeds, investors should refer to the Annu Projects IPO <\/span><a href=\"https:\/\/www.sebi.gov.in\/web\/?file=https:\/\/www.sebi.gov.in\/sebi_data\/attachdocs\/aug-2026\/1787131647537.pdf#page=1&amp;zoom=page-width,-15,842\"><span style=\"font-weight: 400;\">Red Herring Prospectus (RHP)<\/span><\/a><span style=\"font-weight: 400;\"> before making an investment decision.<\/span><\/p>\n<h2><b>Company Overview<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Annu Projects Limited is an engineering, procurement and construction (EPC) company engaged in the development, execution and maintenance of essential overhead and underground utility infrastructure. Its business operations cover telecom, sewerage and gas pipeline infrastructure.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In the telecom segment, the company undertakes surveying, designing and installation of cabling and tower infrastructure, along with communication, automation and electronic security systems. Its customers include Bharat Sanchar Nigam Limited, A2Z Infra Engineering Limited, Bharat Broadband Network Limited and G R Infraprojects Limited. Its sewerage infrastructure activities include pipe laying, manhole construction, sewage treatment plants, pumping stations and other structural works.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In the gas pipeline segment, Annu Projects undertakes the installation of MDPE pipelines ranging from 20 mm to 125 mm in diameter and has executed 38,300 GI house connections for domestic and commercial gas distribution. Its customers in this segment include Indraprastha Gas Limited, Gujarat Gas Limited and GAIL India Limited.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">As of June 30, 2026, the company had 23 ongoing projects with a total value of \u20b919,593.48 million. These included 4 telecom infrastructure projects, 14 sewerage projects, 4 gas pipeline projects and 1 railway signalling project.<\/span><\/p>\n<h2><b>IPO Details<\/b><\/h2>\n<div class=\"wp-block-table\" style=\"width: 100%; border: 1px solid #000000; margin-bottom: 20px;\">\n<table style=\"width: 100%; border-collapse: collapse; font-family: Arial, sans-serif; font-size: 14px; color: #000000; background-color: #ffffff;\">\n<thead>\n<tr style=\"border-bottom: 2px solid #000000;\">\n<th style=\"padding: 12px; border: 1px solid #000000; text-align: left; font-weight: bold; background-color: #ffffff; width: 40%;\">Particulars<\/th>\n<th style=\"padding: 12px; border: 1px solid #000000; text-align: left; font-weight: bold; background-color: #ffffff; width: 60%;\">Details<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">IPO Date<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000;\">25 to 28 Aug, 2026<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Allotment<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000;\">Mon, Aug 31, 2026<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Listing Date<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000;\">Wed, Sep 2, 2026<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Face Value<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000;\">\u20b910 per share<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Price Band<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000;\">\u20b994 to \u20b999<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Lot Size<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000;\">151 Shares<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Issue Type<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000;\">Bookbuilding IPO<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Sale Type<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000;\">Fresh capital only<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Total Issue Size<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000;\">1,76,83,000 shares (agg. up to \u20b9175 Cr)<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Fresh Issue<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000;\">1,76,83,000 shares (agg. up to \u20b9175 Cr)<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Shareholding Pre-Issue<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000;\">4,78,09,670 shares<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Shareholding Post-Issue<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000;\">6,54,92,670 shares<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Listing Exchange<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000;\">BSE, NSE<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p><span style=\"font-size: 10pt;\"><i><span style=\"font-weight: 400;\">(Compiled from RHP and market updates)<\/span><\/i><\/span><\/p>\n<h2><b>Industry Context<\/b><\/h2>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">India\u2019s EPC industry plays a critical role in infrastructure development, supporting projects across telecom, water, railways, transportation, energy and industrial sectors. The EPC model integrates engineering, procurement and construction under a single contractor, providing coordinated project execution.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Infrastructure investment remains a key growth driver for the EPC sector, supported by government-led capital expenditure and initiatives such as Atmanirbhar Bharat, Make in India and the PLI scheme. The Union Budget FY27 allocated \u20b912.20 lakh crore towards capital expenditure, reinforcing the focus on infrastructure-led growth.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Telecom, railway and water infrastructure present significant opportunities, supported by programmes focused on digital connectivity, railway modernisation, water supply and sewerage development. Initiatives such as BharatNet, railway infrastructure programmes, AMRUT and Smart Cities are contributing to project opportunities in these areas.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Government and private-sector clients form an important part of EPC demand, with projects ranging from railways, highways, airports and water systems to industrial facilities and renewable energy. PPP models also enable greater private-sector participation in large infrastructure projects.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Project execution capabilities are becoming increasingly important in the competitive EPC market, with clients evaluating contractors on technical expertise, financial strength, regulatory compliance, cost efficiency, timely delivery and ability to adopt modern technologies. EPC contracts also place significant responsibility on contractors for project costs, timelines and performance.<\/span><\/li>\n<\/ul>\n<h2><b>Business Strengths<\/b><\/h2>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The company undertakes EPC projects focused on underground and overhead utility infrastructure, covering telecom, sewerage and gas pipeline projects.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The company manages project activities across planning, procurement, execution and commissioning for its infrastructure projects.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">As of June 30, 2026, the company had 23 ongoing projects with a total value of \u20b919,593.48 million across telecom, sewerage, gas pipeline and railway signalling projects.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The company reported growth in revenue and profit in FY2026, with revenue from operations increasing to \u20b92,412.48 million and profit after tax rising to \u20b9330.27 million.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The company is led by a management team with experience across its infrastructure and project execution activities.<\/span><\/li>\n<\/ul>\n<h2><b>Business Risks<\/b><\/h2>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">A significant portion of business comes from government entities and large infrastructure companies, making revenue vulnerable to changes in tendering activity, project approvals and public spending.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">EPC projects typically require substantial working capital to fund procurement and execution. Delays in customer payments or milestone-based collections could put pressure on liquidity and cash flows.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The company operates in a competitive infrastructure market where projects are often awarded through bidding processes. Intense competition may lead to pricing pressure and lower project margins.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Future growth depends on securing new projects and maintaining a healthy order book. Any slowdown in new order awards or cancellation of existing projects could adversely affect revenue visibility and business performance.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Delays in construction, procurement or commissioning can increase project costs and expose the company to contractual penalties, performance obligations and potential margin pressure.\u00a0<\/span><\/li>\n<\/ul>\n<h2><b>Financial Performance<\/b><\/h2>\n<h3><b>Annu Projects Ltd. &#8211; Financials (\u20b9 in Million)<\/b><\/h3>\n<p><!-- START RESPONSIVE TABLE CONTAINER --><\/p>\n<div class=\"wp-block-table\" style=\"display: block; width: 100%; overflow-x: auto; -webkit-overflow-scrolling: touch; border: 1px solid #000000; margin-bottom: 5px;\">\n<table style=\"width: 100%; border-collapse: collapse; min-width: 650px; font-family: Arial, sans-serif; font-size: 14px; color: #000000; background-color: #ffffff;\">\n<thead>\n<tr style=\"border-bottom: 2px solid #000000;\">\n<th style=\"padding: 12px; border: 1px solid #000000; text-align: left; font-weight: bold; background-color: #ffffff; width: 40%;\">Particulars<\/th>\n<th style=\"padding: 12px; border: 1px solid #000000; text-align: right; font-weight: bold; background-color: #ffffff; width: 20%;\">Fiscal 2026<\/th>\n<th style=\"padding: 12px; border: 1px solid #000000; text-align: right; font-weight: bold; background-color: #ffffff; width: 20%;\">Fiscal 2025<\/th>\n<th style=\"padding: 12px; border: 1px solid #000000; text-align: right; font-weight: bold; background-color: #ffffff; width: 20%;\">Fiscal 2024<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Revenue from Operations<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">2,412.48<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">1,800.66<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">1,539.82<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Total Income<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">2,445.87<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">1,823.54<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">1,554.17<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">EBITDA<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">501.94<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">321.92<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">285.04<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Profit \/ (Loss) After Tax (PAT)<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">330.27<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">211.04<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">173.87<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">PAT Margin (%)<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">13.69%<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">11.72%<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">11.29%<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Return on Capital Employed (ROCE) (%)<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">22.66%<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">20.59%<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">29.95%<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Return on Equity (%)<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">21.27%<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">17.29%<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">25.23%<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p><!-- MOBILE HINT --><\/p>\n<div class=\"wp-block-hint\" style=\"text-align: center; margin-top: 10px; margin-bottom: 20px; font-size: 13px; color: #666666; font-family: Arial, sans-serif;\">\u2190 Swipe horizontally to view full table \u2192<\/div>\n<style>\n@media screen and (min-width: 768px) {<br \/>    .wp-block-hint {<br \/>        display: none !important;<br \/>    }<br \/>}<br \/><\/style>\n<p><span style=\"font-size: 10pt;\"><i><span style=\"font-weight: 400;\">(<\/span><\/i><b><i>Source:<\/i><\/b><a href=\"https:\/\/www.sebi.gov.in\/web\/?file=https:\/\/www.sebi.gov.in\/sebi_data\/attachdocs\/aug-2026\/1787131647537.pdf#page=1&amp;zoom=page-width,-15,842\"><i><span style=\"font-weight: 400;\"> RHP<\/span><\/i><\/a><i><span style=\"font-weight: 400;\">)<\/span><\/i><\/span><\/p>\n<h2><b>Key Ratios &amp; Metrics<\/b><\/h2>\n<div class=\"wp-block-table\" style=\"width: 100%; border: 1px solid #000000; margin-bottom: 20px;\">\n<table style=\"width: 100%; border-collapse: collapse; font-family: Arial, sans-serif; font-size: 15px; color: #000000; background-color: #ffffff;\">\n<thead>\n<tr style=\"border-bottom: 2px solid #000000;\">\n<th style=\"padding: 12px; border: 1px solid #000000; text-align: left; font-weight: bold; background-color: #ffffff; width: 50%;\">KPI<\/th>\n<th style=\"padding: 12px; border: 1px solid #000000; text-align: right; font-weight: bold; background-color: #ffffff; width: 25%;\">Mar 31, 2026<\/th>\n<th style=\"padding: 12px; border: 1px solid #000000; text-align: right; font-weight: bold; background-color: #ffffff; width: 25%;\">Mar 31, 2025<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Return on Equity (ROE)<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">21.27%<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">17.29%<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Return on Capital Employed (ROCE)<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">22.66%<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">20.59%<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Debt-to-Equity Ratio<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">0.34<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">0.20<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Return on Net Worth (RoNW)<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">21.27%<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">17.29%<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">PAT Margin<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">13.69%<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">11.72%<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">EBITDA Margin<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">20.81%<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">17.88%<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Net Asset Value (NAV per share)<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">\u20b932.47<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">\u20b925.53<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p><span style=\"font-size: 10pt;\"><i><span style=\"font-weight: 400;\">(<\/span><\/i><b><i>Source:<\/i><\/b><a href=\"https:\/\/www.sebi.gov.in\/web\/?file=https:\/\/www.sebi.gov.in\/sebi_data\/attachdocs\/aug-2026\/1787131647537.pdf#page=1&amp;zoom=page-width,-15,842\"><i><span style=\"font-weight: 400;\"> RHP<\/span><\/i><\/a><i><span style=\"font-weight: 400;\">)<\/span><\/i><\/span><\/p>\n<h2><b>Objects of the Offer<\/b><\/h2>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Funding the purchase of machinery and equipment to support business operations.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Meeting the company\u2019s working capital requirements.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Supporting general corporate and business purposes.<\/span><\/li>\n<\/ul>\n<h2><b>Conclusion<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Annu Projects enters the IPO market with an established presence in telecom, sewerage and gas pipeline infrastructure, supported by a diversified project portfolio, integrated EPC capabilities and a healthy order book. The company\u2019s experience in executing utility infrastructure projects, along with its established relationships with government entities and leading infrastructure players, provides a foundation for continued business growth.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Its experienced management team and consistent financial performance are additional positives, while the growing focus on utility development and infrastructure expansion in India could create further opportunities.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Overall, investors should evaluate the company&#8217;s business model, financial performance, industry outlook, competitive positioning, valuation, and risk factors in detail, and carefully review the Red Herring Prospectus (RHP) before making an informed investment decision.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-size: 10pt;\"><b><i>Disclaimer:<\/i><\/b><i><span style=\"font-weight: 400;\"> Investments in the securities market are subject to market risks. Read all the related documents carefully before investing. This content is purely for informational purposes only and should not be considered as investment advice or a recommendation. Securities quoted are for illustration purposes only and not recommendatory. Investors are requested to do their own due diligence before investing.<\/span><\/i><\/span><\/p>\n<p><span style=\"font-size: 10pt;\"><i><span style=\"font-weight: 400;\">Paytm Money Ltd. SEBI Reg. No. Broking &#8211; INZ000240532; Depository Participant &#8211; IN &#8211; DP &#8211; 416 &#8211; 2019, Depository Participant Number: CDSL &#8211; 12088800. Trading and clearing member of NSE (90165, M52073), BSE (6707), MCX (57525), NCDEX (1315, M51110), and MSEI (85300). SEBI Reg. No. Research Analyst &#8211; INH000020086. Regd. Office: 136, 1st Floor, Devika Tower, Nehru Place, Delhi &#8211; 110019. For complete Terms &amp; Conditions and Disclaimers visit:<\/span><\/i><a href=\"https:\/\/www.paytmmoney.com\/stocks\/policies\/terms\"> <i><span style=\"font-weight: 400;\">https:\/\/www.paytmmoney.com\/stocks\/policies\/terms<\/span><\/i><\/a><\/span><\/p>\n<h2><b>FAQs<\/b><\/h2>\n<div style=\"max-width: 100%; margin: 20px 0; font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Roboto, Oxygen-Sans, Ubuntu, Cantarell, 'Helvetica Neue', sans-serif;\">\n<style>\n        \/* Hides default browser arrow\/triangle for a clean professional look *\/<br \/>        summary::-webkit-details-marker { display: none; }<br \/>        summary { list-style: none; outline: none; }<br \/>    <\/style>\n<p><!-- Question 1 --><\/p>\n<details style=\"border-bottom: 1px solid #e2e8f0; padding: 15px 0; cursor: pointer;\">\n<summary style=\"display: flex; justify-content: space-between; align-items: center; width: 100%;\"><span style=\"font-weight: 600; color: #1a202c; font-size: 18px; text-align: left;\">1. What are the Annu Projects IPO dates?<\/span><br \/>\n<span style=\"font-size: 24px; color: #007bff; margin-left: 10px;\">+<\/span><\/summary>\n<div style=\"padding-top: 10px; color: #4a5568; line-height: 1.6; text-align: left;\">The Annu Projects IPO will open for subscription on Aug 25, 2026, and close on Aug 28, 2026. The allotment is expected to be finalized on Aug 31, 2026, with the shares proposed to list on NSE and BSE on Sep 2, 2026.<\/div>\n<\/details>\n<p><!-- Question 2 --><\/p>\n<details style=\"border-bottom: 1px solid #e2e8f0; padding: 15px 0; cursor: pointer;\">\n<summary style=\"display: flex; justify-content: space-between; align-items: center; width: 100%;\"><span style=\"font-weight: 600; color: #1a202c; font-size: 18px; text-align: left;\">2. What is the issue price and minimum investment for the Annu Projects IPO?<\/span><br \/>\n<span style=\"font-size: 24px; color: #007bff; margin-left: 10px;\">+<\/span><\/summary>\n<div style=\"padding-top: 10px; color: #4a5568; line-height: 1.6; text-align: left;\">The IPO has a price band of \u20b994 to \u20b999 per share, with a lot size of 151 shares. Retail investors need to apply for at least one lot, requiring a minimum investment of \u20b914,949 at the upper price band.<\/div>\n<\/details>\n<p><!-- Question 3 --><\/p>\n<details style=\"border-bottom: 1px solid #e2e8f0; padding: 15px 0; cursor: pointer;\">\n<summary style=\"display: flex; justify-content: space-between; align-items: center; width: 100%;\"><span style=\"font-weight: 600; color: #1a202c; font-size: 18px; text-align: left;\">3. What does Annu Projects Ltd. do?<\/span><br \/>\n<span style=\"font-size: 24px; color: #007bff; margin-left: 10px;\">+<\/span><\/summary>\n<div style=\"padding-top: 10px; color: #4a5568; line-height: 1.6; text-align: left;\">Annu Projects Limited is an engineering, procurement and construction (EPC) company involved in developing and maintaining utility infrastructure. Its operations cover telecom infrastructure, sewerage systems and gas pipeline projects, along with railway signalling work.<\/div>\n<\/details>\n<p><!-- Question 4 --><\/p>\n<details style=\"border-bottom: 1px solid #e2e8f0; padding: 15px 0; cursor: pointer;\">\n<summary style=\"display: flex; justify-content: space-between; align-items: center; width: 100%;\"><span style=\"font-weight: 600; color: #1a202c; font-size: 18px; text-align: left;\">4. How will Annu Projects use the IPO proceeds?<\/span><br \/>\n<span style=\"font-size: 24px; color: #007bff; margin-left: 10px;\">+<\/span><\/summary>\n<div style=\"padding-top: 10px; color: #4a5568; line-height: 1.6; text-align: left;\">The Annu Projects IPO is entirely a fresh issue of 1.77 crore shares aggregating to \u20b9175.06 crore. The proceeds from the fresh issue will be utilised for the purposes specified in the company\u2019s IPO documents, supporting its business and project requirements.<\/div>\n<\/details>\n<p><!-- Question 5 --><\/p>\n<details style=\"border-bottom: 1px solid #e2e8f0; padding: 15px 0; cursor: pointer;\">\n<summary style=\"display: flex; justify-content: space-between; align-items: center; width: 100%;\"><span style=\"font-weight: 600; color: #1a202c; font-size: 18px; text-align: left;\">5. What are the key strengths of Annu Projects?<\/span><br \/>\n<span style=\"font-size: 24px; color: #007bff; margin-left: 10px;\">+<\/span><\/summary>\n<div style=\"padding-top: 10px; color: #4a5568; line-height: 1.6; text-align: left;\">The company operates across telecom, sewerage and gas pipeline infrastructure and had 23 ongoing projects valued at \u20b919,593.48 million as of June 30, 2026. Its management team also has experience in infrastructure and project execution.<\/div>\n<\/details>\n<p><!-- Question 6 --><\/p>\n<details style=\"border-bottom: 1px solid #e2e8f0; padding: 15px 0; cursor: pointer;\">\n<summary style=\"display: flex; justify-content: space-between; align-items: center; width: 100%;\"><span style=\"font-weight: 600; color: #1a202c; font-size: 18px; text-align: left;\">6. What are the major risks associated with the Annu Projects IPO?<\/span><br \/>\n<span style=\"font-size: 24px; color: #007bff; margin-left: 10px;\">+<\/span><\/summary>\n<div style=\"padding-top: 10px; color: #4a5568; line-height: 1.6; text-align: left;\">Key risks include project execution delays, dependence on government and institutional contracts, high working capital requirements and intense competition in the EPC sector. Any delay in project approvals, customer payments or new order inflows could affect revenue, cash flows and profitability.<\/div>\n<\/details>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Annu Projects IPO is a book-built issue of \u20b9175.06 crores, comprising an entirely fresh issue of 1.77 crore shares. The IPO will open for subscription on Aug 25, 2026, and close on Aug 28, 2026. The allotment is expected to be finalized on Aug 31, 2026, with the shares scheduled to list on both NSE<a href=\"https:\/\/www.paytmmoney.com\/blog\/annu-projects-ipo-review\/\">Continue reading <span class=\"sr-only\">&#8220;Annu Projects IPO Review: Key Details,Company Overview &#038; Financials&#8221;<\/span><\/a><\/p>\n","protected":false},"author":27,"featured_media":6972,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[15],"tags":[2746,2742,2748,2747,2744,2743,2745,582],"class_list":["post-6971","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ipo","tag-annu-projects","tag-annu-projects-ipo","tag-annu-projects-ipo-analysis","tag-annu-projects-ipo-details","tag-annu-projects-ipo-gmp","tag-annu-projects-ipo-review","tag-annu-projects-limited","tag-upcoming-ipo-2026"],"_links":{"self":[{"href":"https:\/\/www.paytmmoney.com\/blog\/wp-json\/wp\/v2\/posts\/6971","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.paytmmoney.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.paytmmoney.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.paytmmoney.com\/blog\/wp-json\/wp\/v2\/users\/27"}],"replies":[{"embeddable":true,"href":"https:\/\/www.paytmmoney.com\/blog\/wp-json\/wp\/v2\/comments?post=6971"}],"version-history":[{"count":0,"href":"https:\/\/www.paytmmoney.com\/blog\/wp-json\/wp\/v2\/posts\/6971\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.paytmmoney.com\/blog\/wp-json\/wp\/v2\/media\/6972"}],"wp:attachment":[{"href":"https:\/\/www.paytmmoney.com\/blog\/wp-json\/wp\/v2\/media?parent=6971"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.paytmmoney.com\/blog\/wp-json\/wp\/v2\/categories?post=6971"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.paytmmoney.com\/blog\/wp-json\/wp\/v2\/tags?post=6971"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}