{"id":7051,"date":"2026-09-08T13:54:00","date_gmt":"2026-09-08T13:54:00","guid":{"rendered":"https:\/\/www.paytmmoney.com\/blog\/?p=7051"},"modified":"2026-09-08T13:55:35","modified_gmt":"2026-09-08T13:55:35","slug":"lcc-projects-ipo-review","status":"publish","type":"post","link":"https:\/\/www.paytmmoney.com\/blog\/lcc-projects-ipo-review\/","title":{"rendered":"LCC Projects IPO Review: Key Details, Company Overview &#038; Financials"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">LCC Projects IPO is a book-built issue worth \u20b9427.14 crores, comprising a fresh issue of 1.77 crore shares amounting to \u20b9258.00 crores and an offer for sale of 1.16 crore shares aggregating to \u20b9169.14 crores.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The IPO will be open for subscription from September 9, 2026, to September 11, 2026. The allotment is expected to be finalized on September 15, 2026, while the equity shares are proposed to be listed on both NSE and BSE on September 17, 2026.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The price band has been fixed at \u20b9139 to \u20b9146 per share, with a lot size of 102 shares. At the upper end of the price band, retail investors will need a minimum investment of \u20b914,892 for one lot. <\/span><span style=\"font-weight: 400;\">Motilal Oswal Investment Advisors Ltd. is acting as the book-running lead manager for the issue, while Kfin Technologies Ltd. is the registrar.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">For detailed information on the company&#8217;s business, financials, risk factors, and the proposed utilisation of proceeds, investors should refer to the LCC Projects IPO<\/span><a href=\"https:\/\/www.lccprojects.com\/investor-pdf\/ipo\/rhp.pdf\"><span style=\"font-weight: 400;\"> Red Herring Prospectus (RHP) <\/span><\/a><span style=\"font-weight: 400;\">before making an investment decision.<\/span><\/p>\n<h2><b>Company Overview<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">LCC Projects Limited, incorporated in 2017, is an engineering, procurement and construction (EPC) company focused primarily on irrigation and water supply infrastructure projects. Its project capabilities include dams, barrages, weirs, hydraulic structures, canals, pipe distribution networks, lift irrigation works and water supply schemes.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">As of March 31, 2026, the company had 103 projects in its order book. The three largest projects were the Sondwa Lift Micro Irrigation Project, Sidhi Bansagar Multi-Village Scheme and Gandhi Sagar 1 Multi-Village Scheme.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">LCC Projects has also completed several significant contracts, including the Tawa Left Bank Canal Project, Parbati Dam Project, Dudhai Sub Branch Canal Project and AKOT Lift Irrigation Scheme.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The company has expanded its geographical presence from eight states to 12 states as of March 31, 2026. Its operations span Gujarat, Madhya Pradesh, Odisha, Rajasthan, Maharashtra, Uttar Pradesh, Karnataka, Jharkhand, Chhattisgarh, Andhra Pradesh, Himachal Pradesh and Haryana. <\/span><span style=\"font-weight: 400;\">As of March 31, 2026, LCC Projects employed 2,093 permanent employees.<\/span><\/p>\n<h2><b>IPO Details<\/b><\/h2>\n<div class=\"wp-block-table\" style=\"width: 100%; border: 1px solid #000000; margin-bottom: 20px;\">\n<table style=\"width: 100%; border-collapse: collapse; font-family: Arial, sans-serif; font-size: 14px; color: #000000; background-color: #ffffff;\">\n<thead>\n<tr style=\"border-bottom: 2px solid #000000;\">\n<th style=\"padding: 12px; border: 1px solid #000000; text-align: left; font-weight: bold; background-color: #ffffff; width: 40%;\">Particulars<\/th>\n<th style=\"padding: 12px; border: 1px solid #000000; text-align: left; font-weight: bold; background-color: #ffffff; width: 60%;\">Details<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">IPO Date<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000;\">9 to 11 Sep, 2026<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Allotment<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000;\">Tue, Sep 15, 2026<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Listing Date<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000;\">Thu, Sep 17, 2026<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Face Value<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000;\">\u20b95 per share<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Price Band<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000;\">\u20b9139 to \u20b9146 per share<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Lot Size<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000;\">102 Shares<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Issue Type<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000;\">Bookbuilding IPO<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Sale Type<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000;\">Fresh capital cum OFS<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Total Issue Size<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000;\">2,92,56,232 shares (agg. up to \u20b9427 Cr)<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Offer for Sale<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000;\">1,15,85,000 shares of \u20b95 (agg. up to \u20b9169 Cr)<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Fresh Issue<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000;\">1,76,71,232 shares (agg. up to \u20b9258 Cr)<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Shareholding Pre-Issue<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000;\">27,20,00,000 shares<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Shareholding Post-Issue<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000;\">28,96,71,232 shares<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Listing Exchange<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000;\">BSE, NSE<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p><span style=\"font-size: 10pt;\"><i><span style=\"font-weight: 400;\">(Compiled from RHP and market updates)<\/span><\/i><\/span><\/p>\n<h2><b>Industry Context<\/b><\/h2>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">India\u2019s irrigation systems market is projected to grow at a 10.9% CAGR during 2023\u20132028, supported by rising investment and the need to expand and modernise irrigation infrastructure.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">India has the world\u2019s largest irrigated crop area at 8.26 million hectares and the second-largest arable land area at 159.7 million hectares, creating substantial scope for irrigation infrastructure development.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Government initiatives such as PMKSY continue to support irrigation development by improving irrigation coverage, promoting efficient water use and encouraging sustainable water-management practices.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Under PMKSY, central assistance has exceeded \u20b964,407 crore, benefiting more than 27 million farmers and creating or restoring irrigation potential across 24.61 million hectares since FY2017.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">India\u2019s infrastructure spending remains strong, with \u20b912.2 lakh crore allocated towards public capital expenditure in FY2026\u201327, supporting continued development across infrastructure and water-related projects.<\/span><\/li>\n<\/ul>\n<h2><b>Business Strengths<\/b><\/h2>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">LCC Projects operates across critical water-related infrastructure segments, giving it exposure to projects involving irrigation networks, water supply systems and other essential public infrastructure.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The company has expanded its operations across 12 states, reducing dependence on a single regional market and creating opportunities to participate in infrastructure development projects across multiple parts of India.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">With 103 projects in its order book as of March 31, 2026, LCC Projects has a sizeable project pipeline that can support future revenue generation and provide better business visibility.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The company has executed varied infrastructure contracts involving dams, canals, hydraulic structures, lift irrigation and water distribution systems, demonstrating capabilities across multiple stages of water infrastructure development.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">With a workforce of 2,093 permanent employees as of March 31, 2026, the company has developed an established manpower base to support the execution of its expanding project portfolio.<\/span><\/li>\n<\/ul>\n<h2><b>Business Risks<\/b><\/h2>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">A significant part of the company&#8217;s business is associated with irrigation and water supply infrastructure, where project awards and execution can depend heavily on government spending, policies, approvals and administrative decisions.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">EPC projects can face delays arising from land acquisition, regulatory clearances, weather conditions, availability of materials, labour constraints or changes in project specifications, potentially affecting revenue recognition and profitability.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Infrastructure projects generally involve substantial working capital commitments due to payment cycles, retention amounts and project-related expenses, which could place pressure on the company&#8217;s cash flows during periods of delayed collections.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">LCC Projects operates in a competitive infrastructure market where larger established contractors and regional players may compete for government and institutional projects, potentially putting pressure on margins and order acquisition.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The company&#8217;s focus on irrigation and water supply projects exposes it to fluctuations in infrastructure spending and project availability, while any slowdown in awarding new contracts could affect future growth and order-book replenishment.<\/span><\/li>\n<\/ul>\n<h2><b>Financial Performance<\/b><\/h2>\n<h3><b>LCC Projects Limited &#8211; Financials (\u20b9 in Million)<\/b><\/h3>\n<p><!-- START RESPONSIVE TABLE CONTAINER --><\/p>\n<div class=\"wp-block-table\" style=\"display: block; width: 100%; overflow-x: auto; -webkit-overflow-scrolling: touch; border: 1px solid #000000; margin-bottom: 5px;\">\n<table style=\"width: 100%; border-collapse: collapse; min-width: 650px; font-family: Arial, sans-serif; font-size: 14px; color: #000000; background-color: #ffffff;\">\n<thead>\n<tr style=\"border-bottom: 2px solid #000000;\">\n<th style=\"padding: 12px; border: 1px solid #000000; text-align: left; font-weight: bold; background-color: #ffffff; width: 40%;\">Particulars<\/th>\n<th style=\"padding: 12px; border: 1px solid #000000; text-align: right; font-weight: bold; background-color: #ffffff; width: 20%;\">Fiscal 2026<\/th>\n<th style=\"padding: 12px; border: 1px solid #000000; text-align: right; font-weight: bold; background-color: #ffffff; width: 20%;\">Fiscal 2025<\/th>\n<th style=\"padding: 12px; border: 1px solid #000000; text-align: right; font-weight: bold; background-color: #ffffff; width: 20%;\">Fiscal 2024<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Revenue from Operations<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">36,002.52<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">29,182.94<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">24,389.12<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">EBITDA<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">5,198.97<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">4,010.35<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">2,413.65<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">EBITDA Margin (%)<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">14.44%<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">13.74%<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">9.90%<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Profit \/ (Loss) After Tax (PAT)<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">2,864.41<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">2,236.25<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">1,219.97<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Net Worth<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">8,884.11<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">6,049.89<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">3,828.25<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Return on Capital Employed (ROCE) (%)<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">27.13%<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">27.64%<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">27.63%<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Return on Equity (%)<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">32.24%<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">36.96%<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">31.87%<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p><!-- MOBILE HINT --><\/p>\n<div class=\"wp-block-hint\" style=\"text-align: center; margin-top: 10px; margin-bottom: 20px; font-size: 13px; color: #666666; font-family: Arial, sans-serif;\">\u2190 Swipe horizontally to view full table \u2192<\/div>\n<style>\n@media screen and (min-width: 768px) {<br \/>    .wp-block-hint {<br \/>        display: none !important;<br \/>    }<br \/>}<br \/><\/style>\n<p><span style=\"font-size: 10pt;\"><i><span style=\"font-weight: 400;\">(<\/span><\/i><b><i>Source:<\/i><\/b> <a href=\"https:\/\/www.lccprojects.com\/investor-pdf\/ipo\/rhp.pdf\"><i><span style=\"font-weight: 400;\">RHP<\/span><\/i><\/a><i><span style=\"font-weight: 400;\">)<\/span><\/i><\/span><\/p>\n<h2><b>Key Ratios &amp; Metrics<\/b><\/h2>\n<div class=\"wp-block-table\" style=\"width: 100%; border: 1px solid #000000; margin-bottom: 20px;\">\n<table style=\"width: 100%; border-collapse: collapse; font-family: Arial, sans-serif; font-size: 15px; color: #000000; background-color: #ffffff;\">\n<thead>\n<tr style=\"border-bottom: 2px solid #000000;\">\n<th style=\"padding: 12px; border: 1px solid #000000; text-align: left; font-weight: bold; background-color: #ffffff; width: 50%;\">KPI<\/th>\n<th style=\"padding: 12px; border: 1px solid #000000; text-align: right; font-weight: bold; background-color: #ffffff; width: 25%;\">Mar 31, 2026<\/th>\n<th style=\"padding: 12px; border: 1px solid #000000; text-align: right; font-weight: bold; background-color: #ffffff; width: 25%;\">Mar 31, 2025<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Return on Equity (ROE)<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">32.24%<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">36.96%<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Return on Capital Employed (ROCE)<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">27.13%<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">27.64%<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Debt-to-Equity Ratio<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">0.97<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">1.23<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Return on Net Worth (RoNW)<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">32.24%<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">36.96%<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">PAT Margin<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">7.96%<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">7.66%<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">EBITDA Margin<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">14.44%<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">13.74%<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #000000; font-weight: bold;\">Net Asset Value (NAV per share)<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">\u20b932.66<\/td>\n<td style=\"padding: 10px; border: 1px solid #000000; text-align: right;\">\u20b922.24<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p><span style=\"font-size: 10pt;\"><i><span style=\"font-weight: 400;\">(<\/span><\/i><b><i>Source:<\/i><\/b> <a href=\"https:\/\/www.lccprojects.com\/investor-pdf\/ipo\/rhp.pdf\"><i><span style=\"font-weight: 400;\">RHP<\/span><\/i><\/a><i><span style=\"font-weight: 400;\">)<\/span><\/i><\/span><\/p>\n<h2><b>Objects of the Offer<\/b><\/h2>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Purchase of equipment required for business operations.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Repayment or prepayment of outstanding borrowings of the company.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">General corporate purposes and other business requirements.<\/span><\/li>\n<\/ul>\n<h2><b>Conclusion<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">LCC Projects IPO provides investors with exposure to the water and irrigation infrastructure segment, supported by the company\u2019s presence across 12 states, a portfolio of 103 projects and experience in executing dams, canals, lift irrigation and water supply projects. The company also reported growth in revenue, EBITDA and PAT in FY2026, while its debt-to-equity ratio improved to 0.97x. <\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">However, investors should also consider risks related to EPC execution, working capital requirements, dependence on government infrastructure spending, order inflows, project approvals and competition. Overall, investors should evaluate the IPO based on the company\u2019s financial performance, valuation, order-book execution, cash-flow position and associated risks before making an investment decision.\u00a0<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-size: 10pt;\"><b><i>Disclaimer:<\/i><\/b><i><span style=\"font-weight: 400;\"> Investments in the securities market are subject to market risks. Read all the related documents carefully before investing. This content is purely for informational purposes only and should not be considered as investment advice or a recommendation. Securities quoted are for illustration purposes only and not recommendatory. Investors are requested to do their own due diligence before investing.<\/span><\/i><\/span><\/p>\n<p><span style=\"font-size: 10pt;\"><i><span style=\"font-weight: 400;\">Paytm Money Ltd. SEBI Reg. No. Broking &#8211; INZ000240532; Depository Participant &#8211; IN &#8211; DP &#8211; 416 &#8211; 2019, Depository Participant Number: CDSL &#8211; 12088800. Trading and clearing member of NSE (90165, M52073), BSE (6707), MCX (57525), NCDEX (1315, M51110), and MSEI (85300). SEBI Reg. No. Research Analyst &#8211; INH000020086. Regd. Office: 136, 1st Floor, Devika Tower, Nehru Place, Delhi &#8211; 110019. For complete Terms &amp; Conditions and Disclaimers visit:<\/span><\/i><a href=\"https:\/\/www.paytmmoney.com\/stocks\/policies\/terms\"> <i><span style=\"font-weight: 400;\">https:\/\/www.paytmmoney.com\/stocks\/policies\/terms<\/span><\/i><\/a><\/span><\/p>\n<h2><b>FAQs<\/b><\/h2>\n<div style=\"max-width: 100%; margin: 20px 0; font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Roboto, Oxygen-Sans, Ubuntu, Cantarell, 'Helvetica Neue', sans-serif;\">\n<style>\n        \/* Hides default browser arrow\/triangle for a clean professional look *\/<br \/>        summary::-webkit-details-marker { display: none; }<br \/>        summary { list-style: none; outline: none; }<br \/>    <\/style>\n<p><!-- Question 1 --><\/p>\n<details style=\"border-bottom: 1px solid #e2e8f0; padding: 15px 0; cursor: pointer;\">\n<summary style=\"display: flex; justify-content: space-between; align-items: center; width: 100%;\"><span style=\"font-weight: 600; color: #1a202c; font-size: 18px; text-align: left;\">1. What are the LCC Projects IPO dates?<\/span><br \/>\n<span style=\"font-size: 24px; color: #007bff; margin-left: 10px;\">+<\/span><\/summary>\n<div style=\"padding-top: 10px; color: #4a5568; line-height: 1.6; text-align: left;\">The LCC Projects IPO will open for subscription on September 9, 2026, and close on September 11, 2026. The allotment is expected to be completed on September 15, 2026, with the shares proposed to list on NSE and BSE on September 17, 2026.<\/div>\n<\/details>\n<p><!-- Question 2 --><\/p>\n<details style=\"border-bottom: 1px solid #e2e8f0; padding: 15px 0; cursor: pointer;\">\n<summary style=\"display: flex; justify-content: space-between; align-items: center; width: 100%;\"><span style=\"font-weight: 600; color: #1a202c; font-size: 18px; text-align: left;\">2. What is the issue price and minimum investment for the LCC Projects IPO?<\/span><br \/>\n<span style=\"font-size: 24px; color: #007bff; margin-left: 10px;\">+<\/span><\/summary>\n<div style=\"padding-top: 10px; color: #4a5568; line-height: 1.6; text-align: left;\">LCC Projects has fixed the IPO price band at \u20b9139 to \u20b9146 per share. The lot size is 102 shares, making \u20b914,892 the minimum investment required by retail investors for one lot at the upper end of the price band.<\/div>\n<\/details>\n<p><!-- Question 3 --><\/p>\n<details style=\"border-bottom: 1px solid #e2e8f0; padding: 15px 0; cursor: pointer;\">\n<summary style=\"display: flex; justify-content: space-between; align-items: center; width: 100%;\"><span style=\"font-weight: 600; color: #1a202c; font-size: 18px; text-align: left;\">3. What does LCC Projects Ltd. do?<\/span><br \/>\n<span style=\"font-size: 24px; color: #007bff; margin-left: 10px;\">+<\/span><\/summary>\n<div style=\"padding-top: 10px; color: #4a5568; line-height: 1.6; text-align: left;\">LCC Projects Limited is an engineering, procurement and construction (EPC) company focused on irrigation and water supply infrastructure. Its project portfolio covers dams, barrages, canals, hydraulic structures, lift irrigation systems, pipeline distribution networks and water supply schemes.<\/div>\n<\/details>\n<p><!-- Question 4 --><\/p>\n<details style=\"border-bottom: 1px solid #e2e8f0; padding: 15px 0; cursor: pointer;\">\n<summary style=\"display: flex; justify-content: space-between; align-items: center; width: 100%;\"><span style=\"font-weight: 600; color: #1a202c; font-size: 18px; text-align: left;\">4. How will LCC Projects use the IPO proceeds?<\/span><br \/>\n<span style=\"font-size: 24px; color: #007bff; margin-left: 10px;\">+<\/span><\/summary>\n<div style=\"padding-top: 10px; color: #4a5568; line-height: 1.6; text-align: left;\">The net proceeds from the fresh issue will be utilised for the purchase of equipment, repayment and\/or prepayment of certain outstanding borrowings, and general corporate purposes. The company proposes to use \u20b914.69 crore for purchasing equipment and \u20b9180.00 crore for prepayment and\/or repayment, in full or in part, of certain outstanding borrowings. The remaining proceeds will be used for general corporate purposes. The amount raised through the OFS will be received by the respective selling shareholders.<\/div>\n<\/details>\n<p><!-- Question 5 --><\/p>\n<details style=\"border-bottom: 1px solid #e2e8f0; padding: 15px 0; cursor: pointer;\">\n<summary style=\"display: flex; justify-content: space-between; align-items: center; width: 100%;\"><span style=\"font-weight: 600; color: #1a202c; font-size: 18px; text-align: left;\">5. What are the key strengths of LCC Projects Ltd.?<\/span><br \/>\n<span style=\"font-size: 24px; color: #007bff; margin-left: 10px;\">+<\/span><\/summary>\n<div style=\"padding-top: 10px; color: #4a5568; line-height: 1.6; text-align: left;\">LCC Projects benefits from its established presence in the irrigation and water infrastructure segment, a diversified geographical footprint across 12 states and an order book comprising 103 projects as of March 31, 2026. Its experience across various EPC projects also supports its execution capabilities.<\/div>\n<\/details>\n<p><!-- Question 6 --><\/p>\n<details style=\"border-bottom: 1px solid #e2e8f0; padding: 15px 0; cursor: pointer;\">\n<summary style=\"display: flex; justify-content: space-between; align-items: center; width: 100%;\"><span style=\"font-weight: 600; color: #1a202c; font-size: 18px; text-align: left;\">6. What are the major risks associated with the LCC Projects IPO?<\/span><br \/>\n<span style=\"font-size: 24px; color: #007bff; margin-left: 10px;\">+<\/span><\/summary>\n<div style=\"padding-top: 10px; color: #4a5568; line-height: 1.6; text-align: left;\">The company faces risks related to delays in project execution, dependence on government infrastructure spending, working capital requirements and competition within the EPC industry. Changes in regulations, payment delays or slower order inflows could also affect its financial performance.<\/div>\n<\/details>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>LCC Projects IPO is a book-built issue worth \u20b9427.14 crores, comprising a fresh issue of 1.77 crore shares amounting to \u20b9258.00 crores and an offer for sale of 1.16 crore shares aggregating to \u20b9169.14 crores. The IPO will be open for subscription from September 9, 2026, to September 11, 2026. The allotment is expected to<a href=\"https:\/\/www.paytmmoney.com\/blog\/lcc-projects-ipo-review\/\">Continue reading <span class=\"sr-only\">&#8220;LCC Projects IPO Review: Key Details, Company Overview &#038; Financials&#8221;<\/span><\/a><\/p>\n","protected":false},"author":27,"featured_media":7052,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[15],"tags":[2915,2923,2920,2919,2917,2924,2921,2916,2922,2918,2786],"class_list":["post-7051","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ipo","tag-lcc-projects-ipo","tag-lcc-projects-ipo-allotment","tag-lcc-projects-ipo-analysis","tag-lcc-projects-ipo-details","tag-lcc-projects-ipo-gmp","tag-lcc-projects-ipo-listing-date","tag-lcc-projects-ipo-price","tag-lcc-projects-ipo-review","tag-lcc-projects-ipo-subscription-date","tag-lcc-projects-limited-ipo","tag-upcoming-ipos-2026"],"_links":{"self":[{"href":"https:\/\/www.paytmmoney.com\/blog\/wp-json\/wp\/v2\/posts\/7051","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.paytmmoney.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.paytmmoney.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.paytmmoney.com\/blog\/wp-json\/wp\/v2\/users\/27"}],"replies":[{"embeddable":true,"href":"https:\/\/www.paytmmoney.com\/blog\/wp-json\/wp\/v2\/comments?post=7051"}],"version-history":[{"count":0,"href":"https:\/\/www.paytmmoney.com\/blog\/wp-json\/wp\/v2\/posts\/7051\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.paytmmoney.com\/blog\/wp-json\/wp\/v2\/media\/7052"}],"wp:attachment":[{"href":"https:\/\/www.paytmmoney.com\/blog\/wp-json\/wp\/v2\/media?parent=7051"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.paytmmoney.com\/blog\/wp-json\/wp\/v2\/categories?post=7051"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.paytmmoney.com\/blog\/wp-json\/wp\/v2\/tags?post=7051"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}